BMW 5 Series E39

since 1996-2001 release

Repair and operation of the car



BMW E39
+ Introduction
+ Maintenance instruction
+ Current leaving and service
+ Engine
+ Cooling systems, heating
- Power supply system and release
   + Power supply system
   + System of injection of the petrol engine
   - Power supply system of the diesel engine
      Turbocompressor
      System of recirculation of the fulfilled gases (EGR system)
      Device of heating of the fuel filter
      Removal of air from fuel system
      Check, removal and installation of the fuel locking valve
      Removal and installation of nozzles
      Check and adjustment of the moment of the beginning of injection
      Removal and installation of the inlet pipeline
   + System of production of the fulfilled gases
+ Engine electric equipment
+ Manual transmission
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Schemes of electric equipment
+ System of onboard diagnostics




Check and adjustment of the moment of the beginning of injection

Fuel pump of high pressure

1 — a segment spline
2 — a sealing ring
3 — the fuel pump of high pressure
4 — the electromagnetic fuel locking valve
5 — the electromagnetic valve of adjustment of injection
6 — a carving stopper of the pump

For check the indicator with an adapter is necessary for a vvorachivaniye in TNVD. The engine at start has to be cold. Temperature, however, should not be lower + than 20 °C.

 PERFORMANCE ORDER

1. Disconnect a weight cable from the rechargeable battery. The battery is in a luggage carrier behind the right side facing.

 

At a detachment of the battery the memories given in electronic blocks, for example, memories of malfunctions of the engine are erased. Address recommendations of the Section Removal and installation of the rechargeable battery.

2. Remove the inlet pipeline, address the Section Removal and installation of the inlet pipeline.

 

3. Turn off a carving stopper (1) at TNVD. Address an accompanying illustration.

4. Screw an adapter (1) (BMW-135330) and the indicator (2) instead of a carving stopper and slightly tighten it. Address an accompanying illustration.

5. Turn the engine clockwise in the direction of VMT of the 1st cylinder so that the index of the indicator for some time stopped in the lower point. The beginning of rotation has to be at least for 60 - 90 ° to VMT. The piston of the 1st cylinder is in VMT if both cams of the 1st cylinder on the party of a driving chain show upward. For a provorachivaniye of the engine include the 5th transfer, release the parking brake and shift the car. Or tighten a brake, establish RKPP in neutral situation and turn a pulley of a bent shaft a head for the central bolt.

6. Install the indicator on "0".

7. Turn out a stopper (1) at the block of cylinders. Address an accompanying illustration.

8. Turn a bent shaft on 2 turns in the direction of an hour hand so that the mandrel of BMW-112300 or other suitable mandrel (drill) could be inserted through an opening in the block of cylinders into an opening in a flywheel.

Do not turn the engine against the direction of its rotation. It can lead to measurement errors.

9. At a new chain the indicator has to show the course 0.95 ± 0.02 mm.

If the chain has a run over 20 000 km, the indicator has to show the course 0.90 ± 0.02 mm.

10. If value does not correspond to demanded, adjust the pump.

11. Weaken a bolt (3), without turning off it. Address an accompanying illustration.

12. Weaken nuts (1) and (2).

Do not turn off a nut strongly, turn off them on 2 - 3 turns to exclude a chain tension.

13. Turn TNVD so that the indicator showed the required value.

14. Tighten nuts and bolts in the sequence from 1 to 3 moment of 25 Nanometers.

15. Take out a mandrel and once again repeat check. At the same time turn a bent shaft only clockwise.

16. Remove the indicator and take out a mandrel.

17. Insert a stopper into the block of cylinders.

18. Tighten the central stopper with a new sealing ring the moment of 25 Nanometers.

19. Establish a butterdish cover.

20. Install the inlet pipeline, address the Section Removal and installation of the inlet pipeline.

21. Attach a weight cable to the rechargeable battery. Establish hours. Program stations of the radio receiver.

22. Start the engine. If necessary remove air from fuel system.

23. Pass on the car and check tightness of the central bolt. If necessary bring up him.