BMW 5 Series E39

since 1996-2001 release

Repair and operation of the car



BMW E39
+ Introduction
+ Maintenance instruction
+ Current leaving and service
+ Engine
+ Cooling systems, heating
- Power supply system and release
   + Power supply system
   + System of injection of the petrol engine
   - Power supply system of the diesel engine
      Turbocompressor
      System of recirculation of the fulfilled gases (EGR system)
      Device of heating of the fuel filter
      Removal of air from fuel system
      Check, removal and installation of the fuel locking valve
      Removal and installation of nozzles
      Check and adjustment of the moment of the beginning of injection
      Removal and installation of the inlet pipeline
   + System of production of the fulfilled gases
+ Engine electric equipment
+ Manual transmission
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Schemes of electric equipment
+ System of onboard diagnostics




Removal and installation of the inlet pipeline

The inlet pipeline has to be removed for ensuring access before work, for example, on fuel system.

REMOVAL

1. Uncover the engine and a pressurization pipe.

2. Disconnect a weight cable from the rechargeable battery. The battery is in a luggage carrier behind the right side facing.

At a detachment of the battery the memories given in electronic blocks, for example, memories of malfunctions of the engine are erased. Address recommendations of the Section Removal and installation of the rechargeable battery.

3. Uncover with inlet the pipeline of positive contact. Disconnect a positive cable of the rechargeable battery and squeeze two clips. Remove a socle down.

4. Remove the inlet pipeline from a head of cylinders. For this purpose disconnect a cable of the sensor of air temperature of pressurization (3). Address an accompanying illustration. Disconnect a vacuum hose at the valve of recirculation of the fulfilled gases (5) and at the lower part of the inlet pipeline. Turn off bolts of fastening and remove the inlet pipeline with sealing laying (1) from a head of cylinders and from the holder. Do not remove the valve of recirculation of the fulfilled gases with laying (4).


INSTALLATION

1. Fix the inlet pipeline on a head of cylinders by the moment of 25 Nanometers. All laying put new. Fix a support of the case of an oil filter and the pipeline of recirculation to the inlet pipeline also by the moment of 25 Nanometers.

2. Fix a socle of a positive pole on the inlet pipeline and screw a hexagon. Put on a cover.

3. Establish covers of the engine and a pipe of pressurization, address the Section Turbocompressor.
4. Attach a negative cable of the rechargeable battery. Establish hours. Program stations of the radio receiver.