BMW 5 Series E39

since 1996-2001 release

Repair and operation of the car



BMW E39
+ Introduction
+ Maintenance instruction
+ Current leaving and service
+ Engine
+ Cooling systems, heating
+ Power supply system and release
- Engine electric equipment
   - System of ignition
      Security measures during the work with system of ignition
      Removal and installation of the coil of ignition
      Removal and installation of the sensor of a detonation
      Check and replacement of the sensor of impulses
      Removal and installation of the plug of a spark plug
      Removal and installation of the DME control unit
      Spark plugs
   + System of preheat of the diesel engine
   + Systems of a charge and start
+ Manual transmission
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Schemes of electric equipment
+ System of onboard diagnostics




Removal and installation of the sensor of a detonation

REMOVAL

1. Remove the inlet pipeline, address the Section Removal and installation of the inlet pipeline.

2. Rasstykuyte shtekerny connection (1). Address an accompanying illustration.

Arrangement of plugs of cables under the inlet pipeline, looking in front:
1 — the plug of the sensor of a detonation (is closed)
2 — the pulse sensor of a bent shaft
3 — the sensor of recognition of the cylinder

3. Turn out the detonation sensor. In the block of cylinders there are two sensors. Address an accompanying illustration.

Do not mix sensors at installation. It can lead to damage of the engine. For this purpose mark accessions and position of sensors.


INSTALLATION

1. Carefully clear the adjacent surfaces of the block of cylinders/sensor of a detonation.
2. Fix the detonation sensor by the moment of 20 Nanometers.

Observe the inhaling moment since it is important for the correct operation of the sensor of a detonation. At installation of sensors you watch purity.

3. Join shtekerny connections and fix them in holders.
4. Install the inlet pipeline, address the Section Removal and installation of the inlet pipeline.
5. Attach a weight cable to the rechargeable battery. Establish hours. Program stations of the radio receiver.