BMW 5 Series E39

since 1996-2001 release

Repair and operation of the car



BMW E39
+ Introduction
+ Maintenance instruction
+ Current leaving and service
+ Engine
+ Cooling systems, heating
+ Power supply system and release
- Engine electric equipment
   + System of ignition
   + System of preheat of the diesel engine
   - Systems of a charge and start
      Removal and installation of the rechargeable battery
      The low-served rechargeable battery
      Check of the rechargeable battery
      Self-discharge of the rechargeable battery
      Charging of the rechargeable battery
      The generator - general information
      Security measures during the work with the generator
      Check of tension of charging of the generator
      Removal and installation of the generator
      Check and replacement of brushes of the generator and regulator of tension
      Starter
      Removal and installation of a starter
      Removal, check and installation of the electromagnetic traction relay
+ Manual transmission
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Schemes of electric equipment
+ System of onboard diagnostics




Removal and installation of the generator

REMOVAL

1. Disconnect a weight cable from the rechargeable battery. The battery is in a luggage carrier behind the right side facing.

At a detachment of the battery records in electronic memory are erased. Address the Section Removal and installation of the rechargeable battery.

2. Insulate a tape the plug of the cable going to a negative pole of the rechargeable battery to exclude casual contact with battery poles.

3. Remove the air filter, address the Section Removal and installation of the case of the air filter and measuring instrument of mass of air.

4. Remove the fan coupling, address the Section Removal and installation of the fan and coupling of the fan.

5. Take off maple a belt, address the Section Removal, installation and a tension of a maple belt.

6. Disconnect a ventilating hose behind the generator.

7. Disconnect the D+ plug plug from a reverse side of the generator for what press a stopper.

8. Uncover accession of B+. Turn off a nut and remove a thick cover.

9. Turn off bolts of fastening and take out the generator.


INSTALLATION

1. Install the generator, tighten fastening bolts.
2. From a reverse side fix by the moment of 15 Nanometers a cable.
3. Join shtekerny connection and record it.
4. Put on a ventilating hose behind the generator.
5. Put on maple a belt, address the Section Removal, installation and a tension of a maple belt.
6. Install the fan coupling, address the Section Removal and installation of the fan and coupling of the fan.
7. Install the air filter, address the Section Removal and installation of the case of the air filter and measuring instrument of mass of air.