1. Install the panel in the provision of rise, press and hold the panel switch in the direction of "Hebestellung" ("The provision of rise"). 2. Hold the switch in the provision of rise during 5 with: a) after each switching off of food or b) after adjustment of the panel. 3. Hold the switch in the provision of rise during 20 with: a) after malfunctions in work b) electric drive detachments c) works with hummock drives. 4. Initialization is considered finished if the switch is once again pressed in the Provision of Rise direction. |